Florence, KY Transformer Buyers
We buy used, surplus and failed transformers throughout Florence and Boone County. Send the nameplate, take a same-day number, and we handle the crane, the riggers and the truck.

| County | Boone County |
|---|---|
| Market | Small City |
| Ratings | 15 kVA – 100 MVA |
| Freight & rigging | Our cost |
| Payment | Upfront, before loading |
| Testing | Not required |
Selling a Transformer in Florence
Florence sits inside the KY service territory of LG&E and KU, which means most of the distribution equipment coming out of buildings and yards here is standard-voltage, well-documented and genuinely resaleable. We buy it directly — padmount, dry-type, oil-filled, pole-mount and station-class — and we cover all freight and rigging to remove it.
The Kentucky market for used transformers
What comes available in this state is shaped by what it runs: automotive assembly in Louisville, Bowling Green and Georgetown, aluminum smelting and rolling, bourbon production, and the UPS Worldport air hub. On the utility side, LG&E and KU, Kentucky Power, TVA, East Kentucky Power Cooperative all operate here, and surplus programs and system upgrades release both distribution and station-class equipment. Moving it out of Florence means I-65, I-64 and I-75 converge in Kentucky and the Ohio River barge system serves oversize loads. Notably, Kentucky coal plant retirements and the automotive EV conversion build-out are both releasing large industrial transformers on schedule.
Rural and small-city pickups are our cost, not yours
The reason surplus transformers sit for years in places like Florence is that most buyers quietly expect the seller to arrange loadout, and arranging a crane and a lowboy for one unit is expensive and unfamiliar work for a plant manager or a town electrician. We remove that entirely. Our crew brings the lift equipment, the rigging gear and the trailer to Florence and absorbs the cost inside our offer.
Combining freight across Kentucky
For smaller communities we build a route rather than sending a truck for one item. If your unit can wait a short while, we will combine it with other Boone County and Kentucky pickups, which often lets us pay more than a one-off trip would justify. If it cannot wait, tell us the deadline and we will price a dedicated run.
Removal and Value
Access constraints we handle in Florence
Very few transformers sit somewhere convenient. We routinely remove units from basement vaults, upper-floor electrical rooms, fenced substation yards with a single gate, roof-level mechanical decks and live plant floors under escort. Where a unit will not fit through the opening it came in through, we handle door-frame removal, wall coring or on-site disassembly. Where the street must be occupied, we pull the permit. None of that is billed back to you.
Why lead times work in your favor
New transformer lead times have stayed long enough that used and surplus equipment holds unusually firm value. Buyers who need capacity in months rather than years will pay for a tested used unit. That demand is what lets us cover the crane, the riggers and the freight out of Florence and still write you a real check — the equipment is genuinely worth recovering rather than merely worth hauling away.
Equipment We Buy in Florence
Network & Vault Transformers
Submersible and vault-type network transformers with network protectors, pulled from underground vaults in dense urban grids. Awkward to remove, which is exactly why we get called.
300 kVA – 3000 kVAProject lots from 1 to 20 unitsStep-Up & Step-Down Transformers
Generator step-up units, collector-substation transformers and step-down service transformers coming out of retired generation, wind and solar repowering, and industrial service upgrades.
500 kVA – 100 MVA180–240 units in inventory rotationPadmount Transformers
Pad-mounted distribution transformers are the single most liquid item we buy. A dead-front loop-feed unit in the 75 to 2500 kVA range with a legible nameplate and a sound tank can be priced from photographs the same day.
75 kVA – 5000 kVAFlorence Questions
Is your offer contingent on anything?
Do I need to disconnect the transformer first?
Should I drain the oil before you arrive?
Do you actually pay for the freight and rigging out of Florence?
How fast can you get a crew to Florence?
Nearby Coverage
We cover the communities around Florence on the same terms, and we frequently combine pickups across this area into a single route.
Send the nameplate and the location in Florence. Firm number, usually the same business day — and the removal is included.
Transformer to move in Florence?
Payment upfront before loading, no testing required, freight and rigging covered.